Flash Integration

Project Management · Resource Integration

One project lead.
The bench behind it.

Flash Integration puts one owner on the plan, the schedule, and the site — then brings in process, controls, equipment, materials, sourcing, and plant IT only when the project needs them. With OEMs and the plant team: CN · JP · KR · EN · PT.

Project Lead Process Controls Equipment Materials Sourcing Plant IT SAT / FAT CN · JP · KR · EN · PT
SYS / FLASHLIVE
How we work

One lead. Specialists on call. From design to acceptance on a single line: plan, source, accept, start up, secure the plant network, and translate on site.

LEAD ONE
BENCH ON CALL
LANG CN JP KR EN PT

How we work

A single project lead, then the bench behind it

We do not drop a full roster on the floor by default. One person owns the plan, the schedule, and the site. The rest of the bench comes in only when the work needs it.

One Lead

One owner for the plan, the schedule, and the site.

The Bench

Process, controls, equipment, materials, sourcing, and plant IT — called in when needed.

One Stop

From design to acceptance, one team.

Across Languages

CN · JP · KR · EN · PT with OEMs and the plant team.

The bench

What we put on a plant project

01

Process

Electrode, assembly, and formation. Pouch, prismatic stacked, and winding lines — understanding and troubleshooting.

02

Controls

PLC/HMI, electrical design, industrial networks, and work with the plant controls team.

03

Equipment

Robotics, vision, fixtures, SAT and FAT, plus commissioning and acceptance.

04

Materials

Cell chemistry, recycling and electrochemistry support, PFMEA, and quality.

05

Sourcing

CapEx equipment and US–Asia suppliers on one project.

06

Plant IT

Infrastructure, cybersecurity, and AI governance.

07

Project management

Scope, schedule, CapEx, and multi-party coordination with one owner on site.

08

Mechanical design & automation

Robotic cells, fixtures, vision systems, and automation cell design.

09

Formation, PLC & electrical

Formation process with PLC and electrical design on the same line.

10

Equipment acceptance

SAT, FAT, vendor buy-off, incoming checks, install, debug, and close-out.

11

Multilingual supplier communication

CN · JP · KR · EN · PT with equipment and material suppliers on specs, ownership, and delivery.

12

Local team training

Train US engineers and operators on equipment operation, checks, and maintenance.

On the project

From plan to start-up on the plant floor

Plan

Scope, schedule, and CapEx.

Source

US and Asia suppliers on one project.

Accept

SAT, FAT, and vendor buy-off.

Start up

Commissioning, debug, and line start.

Secure

Plant IT and cybersecurity.

Translate

CN · JP · KR · EN · PT on site.

Resources & network

The bench we integrate onto your project

Network

US battery companies across cell makers, equipment vendors, sourcing, and process teams. China battery ecosystem on both equipment and process sides. Introductions to qualified Chinese OEMs, with support in Chinese, Japanese, Korean, and English.

Coverage

Equipment: SAT/FAT, commissioning, machines, tooling, suppliers. Process: electrode, assembly, formation, materials, quality, and plant IT. Cell formats: pouch, prismatic, and winding.